T&L crew and roller resurfacing Bridge Street, Lithgow, steam rising from the fresh asphalt
Council

Road patching, Bridge Street, Lithgow

Failed sections dug out to 150 mm and rebuilt in asphalt, with the footpaths kept open throughout.

Client
Lithgow City Council
Location
Bridge Street, Lithgow NSW
Work
Heavy patching, deep lift
Excavation depth
150 mm

The job

Bridge Street had failed sections of pavement that needed to come out and be rebuilt. We excavated each patch to 150 mm, rebuilt it in deep-lift asphalt and finished it level with the existing road. Traffic control kept the street and footpaths usable while we worked.

What we did

  • Set up traffic control with a safe walking route on the footpath
  • Excavated the failed patches to 150 mm
  • Laid new asphalt in deep lifts and compacted each layer
  • Finished each patch level with the surrounding road

Plant on site

  • Skid steer loader
  • Tipper trucks
  • Roller

How it went

  1. Cones and barriers keeping a walking route open beside the works 1

    Traffic control

    Barriers and cones kept a safe walking route along the footpath.

  2. Skid steer and tipper truck excavating failed patches on Bridge Street 2

    Excavation

    Failed patches dug out to 150 mm.

  3. Deep-lift asphalt patch laid on Bridge Street 3

    Deep-lift patching

    New asphalt laid in deep lifts and compacted.

  4. Completed asphalt patch on Bridge Street, Lithgow 4

    Finished

    Patches finished level with the existing road.

Photos

Select a photo to enlarge it.

Council or civil job?

Approved under Local Government Procurement and on the SSROC contractor panel.