Land slip repair, Wolgan Valley

A slipped section of road rebuilt from the subgrade up, using about 500 tonnes of asphalt.

Client
Lithgow City Council
Location
Wolgan Valley NSW
Work
Land slip repair
Asphalt
About 500 t

The job

A land slip had damaged a section of the road through the Wolgan Valley. We excavated the failed subgrade, rebuilt the pavement in base course and wearing course layers, and used smaller placement equipment on the final layer because of weight restrictions on the road.

What we did

  • Excavated the failed subgrade
  • Placed the asphalt base course
  • Laid the wearing course with lighter equipment to stay within weight limits
  • Finished the surface to match the existing road

Plant on site

  • Excavator
  • Small asphalt placement equipment
  • Rollers
  • Tipper trucks

How it went

  1. Excavator removing failed subgrade beside the guardrail 1

    Subgrade excavation

    Failed ground dug out to a sound base.

  2. Crew laying the wearing course with small placement equipment 2

    Wearing course

    Laid with lighter plant because of weight restrictions.

  3. Completed wearing course on the curve of the road 3

    Wearing course complete

    A smooth, sealed surface through the bend.

  4. Rebuilt road at the land slip site at sunset 4

    Back in use

    The road reopened to traffic.